Skip to main content
chassis cab

Citroen e-Relay Chassis Cab L3H1 4.25T Enterprise

Citroen e-Relay Chassis Cab L3H1 4.25T Enterprise - bare chassis cab for body builders (typical bodies: dropside, tipper, box, Luton, refrigerated). Highest payload (1,770 kg) of any e-Relay since there is no cargo body weight. Range depends on conversion (no WLTP figure published on bare chassis). N2 class. IMPORTANT: Not eligible for Plug-in Van Grant in this configuration - the chassis cab BEV is for large fleet orders only.

1,770 kg
Payload

Data notes

vs UK catalogue
  • Top 10% for payload at 1,770 kg, among UK electric vans.
  • Top 10% for DC charging speed at 150 kW, among UK electric vans.
Lease est.
~£616/mo

Range estimate: WLTP x 0.85 for real-world use x 0.74 for winter x 0.88 when loaded. These are calculator assumptions, not a guaranteed range. Lease costs are estimated from list price after grant; confirm eligibility and obtain a current quotation. Assumptions

Cargo & loading

Body typechassis cab
Payload capacity1,770 kg
Gross vehicle weight4,250 kg

Electric powertrain

Battery capacity110 kWh
Useable battery97.8 kWh
Max DC charge150 kW
AC charge22 kW
DC charge time (0–80%)55 min
Charge portccs
Architecture400V

External dimensions

Length6.00 m
Width2.05 m
Height2.25 m
Wheelbase4.04 m
Turning circle14.28 m
Kerb weight2,480 kg
Towing capacity2,400 kg
Cab seats3

Performance

Power205 kW
Torque410 Nm
Top speed56 mph
Drive typefwd

Fleet & warranty

Warranty3 years / 99,419 miles
Service interval16,000 miles

Fleet scorecard

overall7.5/10
Payload efficiency9.7/10

40.2 kg/£1k

Depot charging fit9.7/10

~251 kWh/window

Body configurability4.2/10

5 configs

Warranty strength6.5/10

3 yr / 160,000 km

Scores are percentile-based against verified UK fleet catalogue. Hover labels for definitions.

Pricing

New price from
£48,994
exc. VAT, before grants

Plug-in Van Grant

This variant falls in the 2.5-4.25t GVW band: up to £5,000 off at the point of sale, capped at 35% of the price. The Plug-in Van and Truck Grant runs until at least April 2027; 2026/27 grant levels have not yet been announced. Grants guide